Everything about Waterloo And City Line totally explained
The
Waterloo & City line is a short underground
railway line in
London, which formally opened on
July 11 1898. It has only two stations,
Waterloo and
Bank (formerly called "City", as it was within the
City of London). Between its stations, the line passes under the
River Thames.
It exists almost exclusively to serve commuters between
Waterloo mainline station and the
City of London, and doesn't operate late in the evening or on Sundays (in fact, during the line's history there has been only a single four-year period, between
1943 and
1947, when the line did operate on that day). By far the shortest line on the
London Underground at only 1.5 miles (2.5 km), it takes only four minutes to travel from end to end. It was the second electric tube railway to open in
London, after the
City and South London Railway (now part of the
Northern line).
History
The
London and South Western Railway reached
Waterloo in
1848. The westerly situation of the
terminus made passenger access to the City of London difficult, and at that time proposals were considered for an extension, but they were put into abeyance on grounds of cost. When the
South Eastern Railway constructed its
Charing Cross line, some through working was operated from the L&SWR line to
Cannon Street, but this was commercially and operationally unsuccessful.
Nonetheless the difficult access continued to be a problem, and eventually the solution was determined to be a tube railway, hugely cheaper than a surface line as it avoided nearly all land acquisition that would have been required on the surface. It was opened in
1898, and operated by the L&SWR, passing into the
Southern Railway on the grouping of British railways in
1923, and subsequently into the
Southern Region of British Railways on nationalisation in
1948. On
privatisation of
British Rail, it was seen as anomalous for it to be part of the
National Rail network, and by agreement it was passed to the custody of
London Underground.
Its ticketing was fully integrated with the national network and passengers could buy through tickets from mainline railway stations to Bank.
The line was designed by
civil engineer W.R. Galbraith and
James Henry Greathead, inventor of the tunneling shield that bears his name.
Features
The Waterloo & City is colloquially known as the
Drain. The origins of this name are somewhat obscure today. One theory is that this arose when the line was operated by traincrew in a link that otherwise operated normal surface suburban routes. In comparison with working surface railways, the Waterloo & City consists, of course, of underground tube tunnels. Messroom conversation would include discussion of what turn a driver would be working tomorrow, and if it was a Waterloo & City turn of duty, it was an obvious metaphor to say that the driver was working "down the drain". Another theory is that it was given this name by the maintenance staff, because the tunnels, being under the river thames, leak considerably allowing much water to enter. This water has to be continually pumped out. This water gives rise to a musty smell which provides a third theory for the name.
Uniquely among London's Underground lines, the Waterloo & City runs underground for its entire length, including both stations. (The
Victoria line comes closest to this, with the only non-underground section being that to the depot).
The Waterloo & City has no direct rail connection to the rest of the rail network, so that vehicle exchanges now require road vehicle transportation. Before the construction of
Waterloo International terminal in
1990, the vehicles were hoisted individually by the Armstrong
lift outside the north wall of Waterloo main-line station. The procedure is now carried out using a road-mounted
crane in a shaft adjacent to the depot, south of
Waterloo mainline station. This is only necessary for major maintenance work that requires lifting of the car body as the Waterloo depot is fully equipped for general maintenance work.
The Waterloo & City originally had its own electric
power station, and
coal was delivered from Waterloo main line station using a second, smaller lift (known as the Abbotts Lift), which explains the continued presence of a
wagon turntable in Waterloo depot. The remaining stub of the siding tunnel that led to the Armstrong Lift can still be seen on the left hand side of the train shortly after leaving Waterloo for Bank. The lift itself was demolished (along with the entire Western sidings) in
1992 due to the construction of
Waterloo International — the
Eurostar terminal.
In
January 2003, the Waterloo & City was closed for over three weeks for safety checks due to a major derailment on the
Central line, which required all
1992 tube stock trains to be modified. That same year, responsibility for the line's maintenance was given to the
Metronet consortium under the terms of a
Public-Private Partnership arrangement.
The line has one unique feature on London Underground operated lines in that all speed limits along the line are in kilometres per hour as are the speed gauges in the driving cabs. All other LUL operated lines are in miles per hour.
Trains
The line has had only three types of
rolling stock in its lifetime.
Original rolling stock
The original wooden stock, consisting of 11 motor and 11 trailer carriages, built by Jackson and Sharp of
Wilmington, Delaware,
USA, using
Siemens electrical motors and control equipment, was used until
1940. The L&SWR was unable to procure the rolling stock from British suppliers at that time. The trains were operated as five trains of four carriages each, with one spare motor and trailer. The trains were of a novel design, being able to be driven from a small semi-open cab at either end of the train. This was achieved by running cables from both motors the length of the train, which allowed the rear vehicle's motors to be controlled by the control equipment on the leading vehicle. Another cable (making nine in all) connected the current collectors at both ends in order to eliminate the power loss that occurs at interruptions in the third rail at switches and crossing where the conductor rail is gapped.
The Board of Trade was dissatisfied with this arrangement and forbade traction current being conveyed between carriages on any further tube projects, forcing the
Central London Railway to use conventional
locomotives.
Five additional single motor cars were ordered from Dick, Kerr and Co. of
Preston in
1899 for single carriage operation outside rush hours.
1940 stock
The original rolling stock was replaced in
1940 by
electric multiple units manufactured by the
English Electric company. The aesthetic design was very modern, representing a railway
art deco look inside and out. It is remarkable that the demands of the
Second World War didn't delay new rolling stock until after the war - virtually every other tube project was either delayed or cancelled altogether; however, having been ordered in 1938 it would have been well advanced when war broke out. This new stock was eventually classified
Class 487 in the
TOPS system. The switchgear on this stock was of the older low-voltage solenoid type that required a large switch compartment behind one of the driving cabs. All other tube stock of the period used the American pneumatic cam (or the later pneumatic cam modified) under the floor, yielding about 33% more passenger space in the motor cars. Unusually for tube trains, the motor cars (the term "carriage" was dropped in the
1930's for tube use) had driving cabs at both ends with the intention of permitting lightweight services to be run during slack periods. This option was never taken up because the design of the cable couplings meant that it was a time consuming operation to separate the motor cars from the rest of the train. In any event only half the cars would be available as the other half were at the 'wrong' end of the remaining train.
The inconvenience to passengers of interior lights being momentarily extinguished as the train passes over conductor rail gaps was partially eliminated in this stock by feeding half the car lights from the motor car at one end of the unit, and half from the other.
1992 replacement
The stock was replaced by
Class 482 units in
1992, which were virtually identical to the 1992 stock used on the
Central line. The line was converted to
four-rail operation in common with other tube lines: the original steel positive rail was retained, with the new negative rail made from aluminium. Since its introduction, this stock on the Waterloo & City has diverged sufficiently from that used on the
Central line through various modifications, primarily to the latter with the introduction of
Automatic Train Operation, that the two are no longer interchangeable. It was almost immediately after the introduction of this stock that management of the line was transferred to
London Underground.
Up to the time of closure for refurbishment (see below) the
Class 482 trains carried the original blue
British Rail Network SouthEast livery that they'd when they were introduced, despite having been part of
London Underground for more than ten years.
Map and stations
In
1959, a pair of
Otis "
Trav-O-Lator"
moving walkways was installed at Bank parelleling the original stairway.
In the
1980's there was a suggestion that an intermediate station be built at
Blackfriars, which is on the route of the line, but nothing further has been heard for many years and the
Department for Transport currently considers this to have "no significant transport benefit".
Refurbishment
The line has been closed on a number of occasions for repairs and vehicle checks, including between
March 31 1994 and
April 5 1994.
The line was shut on
April 1 2006 for refurbishment works. It re-opened on
September 11 2006, eleven days after the predicted completion date of the project. As well as the repainting and cleaning of the trains, the work included refurbishment of the tunnels, platforms and depot, and an upgrade of the track and signalling systems. These and other works to be completed by
2007 are expected to boost rush-hour capacity by 25% and line capability by 12% at a cost of tens of millions of pounds. It is also claimed the average journey will be up to forty seconds faster.
Four new 75-hp battery-powered locomotives named
Walter,
Lou,
Anne and
Kitty were built by
Clayton Equipment in
Derby to haul materials and plant along the line during the closure.
Beyond these changes,
Metronet had planned to refurbish Bank station by
2011 — this is now uncertain since that company is in
administration.
Transport for London have announced plans to install a further entrance to Bank station in Walbrook Square by
2013.
Use as a filming location
Because of its Sunday closures, the Waterloo & City has become a well-established and convenient location for filming, not least because in the days of British Rail (and predecessor) ownership, it could be used in the event of London Transport being either unable or unwilling to allow access to their stations or lines. It can be seen in the 1962
Norman Wisdom film
On the Beat (complete with 1940 stock train); the second series of the
BBC's
Survivors, representing various parts of the Central and Northern lines; and in the 1984 adaptation of
The Tripods, where it masquerades as
Porte de la Chapelle station on the
Paris Métro. It was also used in the 1998
Peter Howitt film
Sliding Doors, portraying Embankment and one other unknown station.
Further Information
Get more info on 'Waterloo And City Line'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://waterloo__amp__city_line.totallyexplained.com">Waterloo & City line Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |